Dry Construction

There are two methods for building a patio - wet and dry construction. In wet construction, you set the stone in a grout setting bed on a concrete slab. In dry construction, you use only a sand base to set the stone.

Dry construction is more suited for the average handyman in that it requires less technical knowhow and equipment. First, The size of the patio should be determined and laid out. Then, the earth should be excavated to a depth of approximately 6 inches. While the edging in the sketch is not essential, it does make it easier to set the stone as well as retain the sand if the patio is raised above the grass. A stone edging approximately 1.5" - 6" can be used or a wood edge can be staked into the earth as shown. When setting the edging, care should be taken to make sure it is level.

Wet and tamp the earth in the excavated area and fill with sand to approximately 1 inch from the top edging. Now, starting in one corner, begin to lay the flagstones on the sand base tamping each piece with a rubber hammer or a block of wood. if the stone sinks too far into the sand, it must be picked up and more sand placed under it. by placing a straight board across the edging, you can determine if each stone is level. when all the stones are laid, sand should be placed on the patio and swept into all the joints. an alternative way to fill the joints is to use crushed stone or decorative gravel.

One thing to keep in mind when choosing stone for your patio laid in sand, is that larger, thicker pieces will stay level longer than smaller, thinner pieces. by keeping the joints to a minimum width, sand and gravel will more readily remain in place and maintenance of the patio will be relatively easy.

Wet Construction

Wet construction is slightly more costly than the dry method. However, the wet method does yield a permanent, maintenance free patio. The basic ingredients for this type of construction are a 4 inch gravel base, a 4 inch reinforced concrete slab, concrete footing to frost line around perimeter, and the flagstone set in a 1 inch grout setting bed.

First, the patio shoudl be laid out with string and stakes. Then, the earth is excavated for a depth of approximately 8 inches. Then, around the perimeter, a trench should be dug the width of a showel to the depth of the frost line in your locality. Some area climatedws will not require a footing be necessary.

After excavation is complete, set up form boards around the perimeter setting the top of the form where the finished patio will be. At this point, care should be taken to allow for drainage off the patio, so water will not remain after a storm. A pitch of 1/4" for every foot will be sufficient for drainage. The form boards should be set to take in this pitch of the patio. Now, we are ready for the gravel base. The gravel should be placed in the excavated area leaving approximately 6 inches showing all around the form boards. After the reinforcing mesh wire is placed over the gravel, we are ready for concrete. Using a mix which consists of one part cement, two parts sand and six parts gravel, pour this concrete to within 2 inches from the top of the framework. Spread the concrete with a rake pulling the reinforced wire up with the rake so that it rests in the concrete rather than on the gravel. No troweling or smoothing necessary since a rough surface is desirable to provide a firm bond for the grout setting bed.

After letting the concrete slab harden (at least 24 hours), we are ready to set the flagstones. A grout setting bed mix consisting of one part cement and three parts sand, is mixed with water to a consistency that could be balled and thrown as that of a snowball. This is then spread over the concrete approximately 1 inch thick. Then, each stone is laid and tamped level.Spread only enough mortar for one or two stones at a time and tamp each one lightly by hammering with a rubber faced mallet or block of wood. You can make sure each stone is level by using a long straight board placed across the frame work.

After a dozen or so stones are laid, each one is picked up one at a time and a cement "butter" is poured over the grout and the stone dropped back in place. This "butter" consists of cement and water mixed in a bucket to the consistency of pea soup. This adheres the dry stone to the fairly dry grout which otherwise would not bond very strongly. When setting stones into the grout, no attempt should be made to fill the spaces or joints between them. These joints are not filled until after all flagstones have been laid and the entire job has been allowed to set at least overnight. Mortar Joints can even be filled in one day later.

For filling joints, a mixture of one part cement and two parts sand should be mixed to a consistency a little wetter than the setting bed. A pointing tool should be used to pack the joints tightly. Use care not to smear cement over the flagstone. If cement does get on the stones, it should be washed off, using a sponge and water, as soon as possible before it hardens permanently.

Flagstone Patterns

We have a variety of patterns to choose from if you need them.